Pickering uses electronic building-permit applications.

Pickering City Hall from Glenanna Road, October 3, 2026. Indoor counters and entrances are not shown.
Pickering City Hall from Glenanna Road, October 3, 2026. Indoor counters and entrances are not shown. Photo: Dillan Payne, Wikimedia Commons, CC BY-SA 4.0.

Key information

Pickering uses electronic building-permit applications. Confirm the project requirements with Building Services, upload the required PDFs and wait for the permit before starting work.

On this page

How the service works

A permit application needs more than a project name. Zoning, the building code and other agency approvals can affect the submission. Conservation authorities or the Region of Durham may need to review a property before a permit or occupancy approval is possible. Ask which documents apply to the actual address.

The city’s current notice says new applications use the 2024 Ontario Building Code. Older 2024 transition notices remain on the page but are not a current reason to submit under the old code. Permit review time depends on the completeness and type of the application; no universal issue date is promised.

Sources: Home building permits and online applications in Pickering, Ontario official information

Compare the options

Common home-project checkpoints from the city’s non-exhaustive list
ProjectCheck before applying
Addition, new building or structural alterationBuilding permit and design documents
Change of room/building usePermit may be needed without construction
Deck more than 60 cm highListed permit trigger
Accessory structure over 15 m²Listed permit trigger
Attached accessory structure or plumbingPermit regardless of size
Basement entranceCity says professional-engineer involvement is required
Window/door opening size or location changeDifferent from like-for-like replacement
Like-for-like repairConfirm exemption and zoning; do not infer from appearance

Sources: Home building permits and online applications in Pickering, Ontario official information

What to prepare

  • Project-specific required documents and drawings.
  • Unlocked, flattened PDF files.
  • Owner authorization if another person applies.
  • Relevant zoning and agency approvals.
  • Correct digital application route.
  • Fee payment and the issued permit before construction.

Sources: Home building permits and online applications in Pickering, Ontario official information

Steps to use the service

Steps to use the service
  1. Confirm the project

    Contact Building Services and identify the address, project and required documents.

  2. Submit electronically

    Upload the complete files through the appropriate permit system.

  3. Complete review and fees

    Respond to requests, pay billed amounts and obtain the issued permit.

Sources: Home building permits and online applications in Pickering, Ontario official information

Eligibility and local rules

Which home projects commonly need a permit?

The city lists new buildings, additions, tenant fit-outs, structural changes, new or enlarged openings, heating/plumbing changes, foundations, basement entrances, higher decks and some retaining walls. Its project list is not exhaustive.

Source: Home building permits and online applications in Pickering, Ontario official information

Does a change of use need a permit without construction?

Yes. The city says changing a room or building’s use can require a permit even when no physical work is proposed, such as turning a den into a bedroom or an office into retail.

Source: Home building permits and online applications in Pickering, Ontario official information

What are the deck and accessory-building thresholds?

The city lists decks more than 60 centimetres above ground and accessory structures larger than 15 square metres. An attached structure or a structure with plumbing requires a permit regardless of size. Other zoning requirements can still apply.

Source: Home building permits and online applications in Pickering, Ontario official information

Using the service

Which repairs usually do not need a building permit?

The city lists like-for-like roofing without structural work, house windows/doors without opening changes, some direct fixture replacements and cabinetry without plumbing. The exact project still must satisfy zoning and applicable requirements.

Source: Home building permits and online applications in Pickering, Ontario official information

Can a designer or contractor apply for me?

Yes. You can authorize a qualified designer or contractor. The owner/constructor remains responsible for compliance and for ensuring the right approvals are obtained.

Source: Home building permits and online applications in Pickering, Ontario official information

What files do I submit?

Prepare the project’s required forms and drawings as unlocked, flattened PDFs. Use the permit submission portal; printed submissions and drawings sent to the general email box are not accepted for review.

Source: Home building permits and online applications in Pickering, Ontario official information

Are demolition and sign applications handled the same way?

They are still electronic, but staff supply a link to the digital system. Ask Building Services for the correct process instead of selecting an unrelated permit type.

Source: Home building permits and online applications in Pickering, Ontario official information

Exceptions and help

How are fees charged?

An initial minimum fee is billed at submission. Staff assess the full fee after review and email later bills. All required fees, deposits and charges must be paid before issue. Fees increased July 1, 2026, for submissions after June 30.

Source: Home building permits and online applications in Pickering, Ontario official information

Can I pay by credit card online?

Yes. The portal’s credit-card payment carries a 2.65% convenience fee, with limitations. Applications from before January 1, 2024 may not qualify for portal payment. Use the payment route tied to your application.

Source: Home building permits and online applications in Pickering, Ontario official information

When may I start and how do I change approved plans?

Never start before permit issue. The city says construction may start within six months of issue. Changes to an issued permit require a revision; contact Building Services at 905-420-4631.

Source: Home building permits and online applications in Pickering, Ontario official information

Local service locations

Pickering Building Services

One The Esplanade, Pickering, Ontario

The Civic Centre counter handles enquiries and helps applicants find the electronic route. It does not accept printed permit packages or review drawings sent to the general enquiry mailbox.

Pickering City Hall from Glenanna Road, October 3, 2026. Indoor counters and entrances are not shown.
Pickering City Hall from Glenanna Road, October 3, 2026. Indoor counters and entrances are not shown. Photo: Dillan Payne, Wikimedia Commons, CC BY-SA 4.0.
Phone
905-420-4631
Service
Building-permit enquiries and application routing

Sources: Building permit process

Google Maps uses the named destination and recorded address. The map is not proof of an accessible entrance, current opening or available service.

Sources: Home building permits and online applications in Pickering, Ontario official information

Official contacts and forms

Sources: Home building permits and online applications in Pickering, Ontario official information